1997 - 1999 Power Industry, Global Procurement Manager or Purchasing Manager, Deutsche Babcock China (Beijing, China)
Handled an US 160 million purchasing project
Sourcing for machinery, electric, steel, and other components from China for the company’s utility boilers (about 300 – 700 MW boiler) projects worldwide – notably Germany, India, Turkey.
- Prepared inquiries,
- Evaluated quotes from Chinese suppliers,
- Conducted factory visits and quality surveillance,
- Negotiated with candidate suppliers for utility boiler equipments, materials, components, accessories, services and engineering and
- Technical review of utilities boiler projects (660MW) in China for the tender process.
- Coordinated for a 160 million US$ purchasing order for the 2x600MW steam boilers at Dezhou Power Plant Phase II, Shandong., China with a project team comprised of engineers and managers from Germany, China and other countries
My secondary role was the technical design and modifications to preset utilities boiler design and participation in the thermal and fluiddynamic tests and experiments to new models under development onsite.
Special attention was given to burner and fluidized bed boiler aerodynamics where multi-phase flow and turbulent flow mechanics
were intensively explored.
1996 - 1997 Power Industry, Senior Electrical Engineer and Marketing Manager, ALSTOM East China (Shanghai, China)
Explored marketing with values of over US$ 13 billion
Technology support, marketing and coordinating of sales in the Southeastern China area for
- Power (Power Plant equipment) and
- Industrial (industrial equipment incl. airport baggage handling and sorting system, automobile painting line equipment, pump and pumping stations, servo-motors, press machines for aircraft manufacture, valves and others) and
- Naval Divisions
with a market value of over US$ 13 billion.
Specific duties:
- Performed technology support of the power equipment division in east China area incl. redesign or modification of the thermodynamic and fluid dynamic systems and parameters of turbines in operation or maintenance,
- participated in the technical review of the tender documents based on thermophysical sciences - thermodynamics, fluid dynamics, heat transfer and combustion theory.
- Coordinated for the technology and production cooperation with Shanghai Steam Turbine Works and Shanghai Boiler Works
- Conducted marketing in the hydropower, industrial and navy divisions of the ALSTOM group,
- Pioneered in the exploration of the industrial equipment (airport baggage handling system, automobile painting line, sewage treatment system), hydropower (particularly pumped storage power stations) and naval business
- Pursued marketing and sales activities with people and organizations involved in the three areas, such as government bodies, engineering, research, design, construction, investment and operation entities in the east China regions;
- Coordinated with people of Alstom Group worldwide (France, Germany, UK, Brazil etc) for the pre-marketing presentation
1994 - 1996 Project Engineer at TÜV Rheinland (Shanghai, China)
Quality Assurance Certification for exporters and major manufactures in China, e.g.
- The automobile industry (Volkswagen),
- Aircraft (AMECO) – a Lufthansa/CAAC joint venture,
- Machinery (Schindler, Schenck),
- Electric (Siemens Automation) etc.
A pioneer in the ISO 9000 certification industry for TÜV Rheinland China and a pioneer in this industry as well. Opened the door of success for the German certification body by acquiring the Volkswagen contract.
1993 - 1994 Period of Chaos
During this period I have changed my jobs fairly frequently duo to my unstable situations:
- China Great Wall Industries/China Precision Machinery Imp & Exp Co’s Shenzhen Branch, Tradesman
- PhoneStar Telecom, deputy GM
- Guangzhou Southern Real Estates Ltd. (a military backed company), developer and tradesman
- CNEEC (China National Electric Equipment Corp.) Shanghai
1992 - 1993 Opto-electronics Industry, Quality Dept Manager, Siemens Heimann Optoelectronics (Shenzhen, China)
Manager of the Quality Department of the then Siemens subsidiary, a leader in the production of flash lights, opto-sensitive cells for cameras and radioactive detectors for customs offices and aeroplanes.
- Managed and maintained a certified quality system and a well organized quality control team,
- stabilized and improved the failure rate of the products,
- helped establish the product quality standards and
- coordinated with Heimann’s subsidiaries in Singapore and its Headquarters in Germany for quality and other issues.
My other assignment:
- evaluated and improved the production processes of the opto-electronic products using thermodynamic techniques and other mechanical technologies,
- assisted in the drafting of process, and quality standards for the opto-electronic components (flash lights for aircrafts, opto-electronic sensors of cameras, scanners for customs offices etc)
1990 - 1992 Nuclear Power Industry, Quality Assurance Engineer, GNPJVC (EDF+Framatome+Bechtel+Alstom+CPL+CNNIC) ( Shenzhen, China)
Reported a major failure of generator stator moisture problem
Quality Assurance for the construction, installation, start up and commissioning of the nuclear and conventional islands according to IAEA (International Atomic Energy Agency) and French (Electricite de France) and American (Bechtel International) practices
- Supervised the quality control and assurance activities during the construction, testing and commissioning of the nuclear and conventional islands and also the BOP of the 2x900 MW, HK-financed and France-licensed nuclear power plant at Daya Bay, Guangdong, some 40 miles from Hongkong under the leadership of EDF of France and Bechtel International of the U.S.
- Reported a major failure of generator stator moisture problem during the installation of the steam generator unit.
Special attention was paid to the installation, test and commissioning
of the
- primary loop of the nuclear island,
- the steam turbines,
- he generators,
- the steam separators and
- the condensers.
Found a major defect of the generator in the installation and maintenance process.
Evaluated and conducted onsite tests, experiments of thermodynamic systems and features of various systems, equipment, and components (steam turbines, condensers, separators, heaters, pumps and other fluid machineries) and during the construction, installation, start up and commissioning of the nuclear and conventional islands.
GNPJVC (Guangdong Nuclear Power Joint Venture Company) was a joint venture between EDF, Bechtel, China Light & Power and China National Nuclear Power Corp., with consultancy provided by GEC Alstom (now ALstom), Framatome (now AREVA) and others.
1989 - 1990 Power Industry, Design Engineer, Guangdong Electric Power Design Institute (Guangzhou, China)
Designed the main workshop of the first 300MW power plant at Shajiao Phase II with CAD technology.
As the first engineer in this institute to design the main workshop of the 2x300MW power plants in Guangdong province with CAD software in VAX.
Performed CFD simulation of various ducts, flows, rotary machines and condensers, as well as thermodynamic simulation of the entire plant for estimation of thermal efficiency and power optimization.
Took a parttime job at Lo’s Trade (U.S.A) Co, Guangzhou Representative Office as a businessman.
1983 - 1986 Power Industry, Assist Engineer, China General Electric Company and China National Electric Equipment Company under the Ministry of Machinery of China (Beijing, China)
Coordination for power plant equipment technology licensing (from Westinghouse, ABB, KWU etc) nationwide, particularly the turbines and boiler technologies with indepth researches of technologies according to thermal sciences.
Took part in the coordination for national power equipment manufacturing technology, and negotiation with ABB, Westinghouse, EBASCO etc.
Trained at Shanghai Turbine Works, Shanghai Boiler Works and Shanghai Power Generation Equipment Research Institute for two years. Familiarized with manufacturing technologies of steam turbines, boilers and the thermodynamic system of large power plants.
Acquired full knowledge and experiences with the Chinese central government system;
Proposed reform plan to the Minister, not just for the Ministry of Machinery but for the overall Chinese government system as well, which were step by step realized over the next 20 years or so.
Attended major planning and coordination meetings with the Minister every month (The Monthly Minister Meeting). |